I - 196 Business Loop (BL) Crossing Study
Click Below to View the Full Study!
Quick Facts
The MACC chose the consulting firm CDM Smith to develop the document and guide the study
The study limits are from 120th/Waverly Road to 88th/Fairview Avenue
MDOT will be doing road maintenance on this stretch in 2024
MDOT has agreed to do existing crossing upgrades during the 2024 project
The study suggests two bridge locations. One primary and one Illustrative
Primary - In between 92nd Ave and 88th Ave
Illustrative - VanHill Drive through Consumer’s Energy right-of-way
The MACC is actively pursuing grants to make all these upgrades a reality